The countdown, the hydraulic fluid reservoir, a hydraulic pump, and the two preburners.

Cookies (NF) Cocoa (B) Bread (2) (1) (NF) Green beans and broccoli (R) Cream of Celery Soup Roast Duck Mashed Sweet Potatoes Prepare same as Fried Drop Cakes 1⅓ cups brown.

MANIPULATOR POWER DRIVE UNIT THRUST VECTOR CONTROL FOUR-CHANNEL SERVOACTUATORS BODY-FLAP ROTARY ACTUATORS ACTUATORS LANDING GEAR PAYLOAD BAY AREA ACCESS BRIDGES PLATFORM LEVEL FOR ACCESS ELEVATOR Figure 6-2.—Orbiter Processing Facility. 6-23 ORBITER PROCESSING FACILITY Figure 6-22.—Solid Rocket Booster Disassembly Facility The Parachute Refurbishment Facility. Ж p" FIRST WASH mc ДЕЕ HANGAR AF AL HIGH-PRESSURE WASH FACILITY Figure 6-8.—Launch Pad 39-A surface arrangement. 6-16 AS. CO.

63.1 m (207 FT) —— EL 57.6m ZN (189 Im EL 57m (187 FT) — Va / EL 25m (82 FT) — ELO PAD SURFACE BOTTOM OF FLAME TRENCH PA HYDROGEN Z i.