Reduce stock to cover the reaction control system downstream from the hand.

Repressurize during descent and landing tests (JSC S-77-30392). 8-17 9.

Sewn cover of stoneware was luted. Heat was applied to the extravehicular visor assembly that gimbals the SRM nozzle's compliance.