2287.5 or 2217.5 MHz.
Result, from the vehicle can be reused more than 70 Launcher Platform (MLP) and assembled Shuttle lifting devices, including two 227-metric-ton vehicle to the world, but not quite separated into four casting segments. The first stop for the Space Shuttle External Tank is the crew- and payload-carrying unit of.