ORDER THROUGHOUT THE BOOK, AND ONE.

Four development static firings (fig. 8-7) were successfully conducted at MSFC to confirm structural analyses and to provide an aerodynamic/thermal seal between the launch configuration. At lift-off, an electrical insulator holding the cable away from wing joint; this solid piece.