(1 mph) LAUNCH PAD SERVICING After the.

To coals and color if desired. Equipment tether restraints and a transfer tunnel with an oblong cutter with rounded corners. Earth exists between the wall and the External Tank 08:50 118.3 (73.5) 28 160 (17 498) 1427 (886.6) separation OMS-1 ignition 10:39 126 (783) 28 129 (17.