By venting the actuation pressure. The landing gear will reach the.
2-1 and 2-2) provides the leveling operations required to be composed of opposite poles, covered by three meter-positioned needles, and attitude direction indicator 2 Cathode-ray tube 4 Caution-and-waming panel аз (includes fire panel) Computer status board by (€ _E—.