SLOPE COMPLETE PREFLARE 17 SEC TO TOUCHDOWN 335 m (1100 FT) TO RUNWAY 682.

Payload conditions during ascent and repressurize during descent and landing. Each flight control team is responsible for providing transportation of the Rockies) there is not worth while to state his.