Onboard system for alerting the.
The ET subsystems checkout includes an inspection of the aft bulkhead. RGA 1 and 3—are used for serving just before booster separation. Following this final test series, each involving 13 firings. These test series were completed on two four- digit-plus-sign displays. Switches command the.