Controlling, most of the mid The shade is installed next.
(2 mph) Loaded 1.6 km/hr (1 mph) LAUNCH PAD AREA 67 hectares (165 acres) CE 6. MISSION OPERATIONS AND SUPPORT EQUIPMENT PAYLOAD CANISTER PAYLOAD TRANSPORTER PERSONNEL ACCESS DOOR PAYLOAD CANISTER (HORIZONTAL) TO PAD VIA VEHICLE TRANSPORTATION ASSEMBLY INTERSITE BUILDING CANISTER (IN ORBITER) AUTOMATED PAYLOADS PROCESSING FACILITIES AND ЕОМІРМЕМТ.............................. 6-30 Mate/Demate Stiffleg Derrick The mate/demate stiffleg derrick will be 2.3 kilograms (5.