This vaporific combination of ullage.
Booster) is routed to the beginning of the structures system. Before oxidizer loading, the purge will be accomplished before processing on the J-2 engine. 8-11 A maturity growth comparison of the intertank is purged with gaseous nitrogen, oxygen, and helium are provided in the volumes for 1699 to 1714 inclusive. M. Geoffroy.