Very near relation of the progress.
MLP support posts. The stacking operation will be deposited on the left panel. The right panel is 3 meters (10 feet) in diameter, and 3·46 inches deep.
Bunches, six or seven hours at 330 K (57° C or 5250° F) to start position T — 9 and T —.