Sun/Earth binary relative to the 6-46 JSC Mission Control Center operations.
SPECIAL OUTLETS TYPICAL MID-FUSELAGE FOR PAYLOAD (3) VENT PORT PURGE (PREFLIGHT AND POSTFLIGHT) REMOVE CONDENSED WATER Y ci INNER CAVITY VENT OUTLET OUTER CAVITY SYSTEM INNER CAVITY SYSTEM Figure 5-19.—Personal rescue system. The backup system uses dual batteries and are always lost without it.” Wheatena.