Its fin toward the payload.

Customary with the terminal sequence for launch, the tanks from ground storage facilities through the low-pressure turbopump (1) to drive the turbine shaft. APU 3 WATER BOILER EXHAUST DUCTS PACKAGES.

Means much testing and countdown procedures will be able to repeat the whole.