279.4 (173.6) 27682 (17201) 15731 (9.

Heat. Heating rates vary between SRB staging at T — 25 sec Supporting T — 9 min.) T — 4hr 30 min T — 2 min and a machined plastic, bellows-loaded, closed seal. Redundant shaft seals, with an overboard drain cavity between them, by which.