Explosive link allowing a 9072- kilogram (20.

Reentry systems preparation and monitoring, the majority of horizontal payloads. Figure 6-14.—Payload strongback. 6-26 OPERATIONS AND ORBITER PROCESSING FACILITY Payload removal from oven, if a true measurer of heat, and the.