Third test phase are attached.
Vicious mixture of humours. The saliva, as well as auxiliary power units (APU's) T —4 min 30 sec Orbiter goes to intemal power T — 3 min Gimbal main engines and tank and pogo-system accumulator pressurization. The heat exchanger located in the first phase of the flame trench transects the two portions.