66-centimeter (26-inch) clearance between the ground per ground command.

Errors by three major ring frame. The second booster is then closed. , AMMONIA BOILER АМО TANKS (ATMOSPHERE HEAT SINKS) PAR t. ST lg AVIONICS BAYS (4, 5, AND 6) FUEL FUEL SERVICING - ISOLATION RECEPTACLES VALVES (2) AND FILTER (1) | 7 / & SS асе APU SYSTEM 2 MAIN PROPULSION SYSTEM TESTS Space Shuttle Vehicle Processing.